Thanks to 6 of you showed up in today's final mural fabrics installation session. After set up the scaffold and prepared the gel medium for mounting the mural fabrics. We worked on mount the first section fabric onto the wall. It was hard to mount the first section because of the distraction from all the events happened at the same time in the second floor. Setting up the next two sections were not as hard as the first one. Then we worked on the both sides first and left the most difficult center door part done later. Finally, we cut the sections to fix the door frame and door and mounted all sections on to the metal door and frame. The mural was complete mounted by the afternoon. I have attached the mural fabrics installation process pictures on this announcement. We will work on the final touch up to match the colors between the sections tomorrow morning at 11:00. Again, thanks a lot for your participation in this final mural installation.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment